{"id":21110,"date":"2013-05-16T15:59:21","date_gmt":"2013-05-16T20:59:21","guid":{"rendered":"http:\/\/swanriver.valleybiz.ca\/news\/?p=21110"},"modified":"2013-05-16T16:08:16","modified_gmt":"2013-05-16T21:08:16","slug":"highway-10-east-reopens-after-repairs","status":"publish","type":"post","link":"https:\/\/swanriver.valleybiz.ca\/news\/2013\/05\/16\/highway-10-east-reopens-after-repairs\/","title":{"rendered":"Highway 10 East Reopens After Repairs"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/swanriver.valleybiz.ca\/news\/wp-content\/uploads\/2011\/04\/manitoba-logo.jpg\" alt=\"\" title=\"Province of Manitoba\" width=\"200\" height=\"89\" class=\"alignleft size-full wp-image-665\" srcset=\"https:\/\/swanriver.valleybiz.ca\/news\/wp-content\/uploads\/2011\/04\/manitoba-logo.jpg 200w, https:\/\/swanriver.valleybiz.ca\/news\/wp-content\/uploads\/2011\/04\/manitoba-logo-100x44.jpg 100w\" sizes=\"auto, (max-width: 200px) 100vw, 200px\" \/>PTH 10 EAST OF SWAN RIVER REOPENS AFTER REPAIRS T0 MAJOR CULVERT WASHOUT<\/p>\n<p>Manitoba Infrastructure and Transportation advises repairs have been completed and PTH 10 has been reopened following a spring run-off culvert washout approximately six kilometres east of PR 488 near Swan River.<\/p>\n<p>The road was closed April 30 between PR 488 and PR 366, between Swan River and Minitonas, and a municipal road was used as a detour. The $400,000 project was completed on a priority basis and involved rerouting traf\ufb01c to the detour, clearing the damaged culverts, installing new ones, back\ufb01lling and compacting the culverts, and finally restoring the roadbed. <\/p>\n<p>The province worked with the Rural Municipality of Swan River to improve the detour road with additional gravel and a grader on the detour regularly. <\/p>\n<p>The department says this was one of the larger infrastructure repairs related to the \ufb02ooding this year.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>PTH 10 EAST OF SWAN RIVER REOPENS AFTER REPAIRS T0 MAJOR CULVERT WASHOUT Manitoba Infrastructure and Transportation advises repairs have been completed and PTH 10 has been reopened following a spring run-off culvert washout approximately six kilometres east of PR 488 near Swan River. The road was closed April 30 between PR 488 and PR [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[],"class_list":["post-21110","post","type-post","status-publish","format-standard","hentry","category-local"],"_links":{"self":[{"href":"https:\/\/swanriver.valleybiz.ca\/news\/wp-json\/wp\/v2\/posts\/21110","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/swanriver.valleybiz.ca\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/swanriver.valleybiz.ca\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/swanriver.valleybiz.ca\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/swanriver.valleybiz.ca\/news\/wp-json\/wp\/v2\/comments?post=21110"}],"version-history":[{"count":0,"href":"https:\/\/swanriver.valleybiz.ca\/news\/wp-json\/wp\/v2\/posts\/21110\/revisions"}],"wp:attachment":[{"href":"https:\/\/swanriver.valleybiz.ca\/news\/wp-json\/wp\/v2\/media?parent=21110"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/swanriver.valleybiz.ca\/news\/wp-json\/wp\/v2\/categories?post=21110"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/swanriver.valleybiz.ca\/news\/wp-json\/wp\/v2\/tags?post=21110"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}