{"id":18778,"date":"2012-12-15T11:58:16","date_gmt":"2012-12-15T17:58:16","guid":{"rendered":"http:\/\/swanriver.valleybiz.ca\/news\/?p=18778"},"modified":"2012-12-15T11:58:16","modified_gmt":"2012-12-15T17:58:16","slug":"highway-improvements-completed-in-swan-valley","status":"publish","type":"post","link":"https:\/\/swanriver.valleybiz.ca\/news\/2012\/12\/15\/highway-improvements-completed-in-swan-valley\/","title":{"rendered":"Highway Improvements Completed in Swan Valley"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/swanriver.valleybiz.ca\/news\/wp-content\/uploads\/2011\/04\/manitoba-logo.jpg\" alt=\"\" title=\"Province of Manitoba\" width=\"200\" height=\"89\" class=\"alignleft size-full wp-image-665\" srcset=\"https:\/\/swanriver.valleybiz.ca\/news\/wp-content\/uploads\/2011\/04\/manitoba-logo.jpg 200w, https:\/\/swanriver.valleybiz.ca\/news\/wp-content\/uploads\/2011\/04\/manitoba-logo-100x44.jpg 100w\" sizes=\"auto, (max-width: 200px) 100vw, 200px\" \/>The completion of five significant upgrades to highways and infrastructure in the Swan River and Dauphin areas at a cost of more than $20 million will increase safety and improve traffic flows for motorists, truckers and farmers, Infrastructure and Transportation Minister Steve Ashton announced today.<\/p>\n<p>&#8220;This investment in highways and roads, and the installation of a new bridge is a key step in our commitment to maintain and upgrade our highways for the benefit of all Manitobans,&#8221; said Ashton. <\/p>\n<p>The work this summer and fall included:<br \/>\n* installation of a new bridge over the Bowsman River on PTH 10 north of Bowsman at an approximate cost of $2.4 million;<br \/>\n* paving of PTH 5 south of PTH 19 at an approximate cost of $6 million;<br \/>\n* grading and gravelling of PR 588 north of PR 275 west of Swan River for a distance of 1.6 kilometres at an estimated cost of $550,000;<br \/>\n* repairing a culvert and the road surface on PTH 83 just north of PR 367 at an estimated cost of $2.5 million; and<br \/>\n* paving of PTH 68 in the Lake Manitoba Narrows area at an estimated cost of $8.8 million.<\/p>\n<p>&#8220;Modern roads like these help build more vibrant local economies, healthier local communities and stronger links between communities across the province,&#8221; Agriculture, Food and Rural Initiatives Minister Ron Kostyshyn said.<\/p>\n<p>The projects were part of Manitoba&#8217;s 10-year commitment to upgrade highways and roads and is part of $589 million budgeted in 2012 for improved roads and bridges across the province, Ashton said, adding, so far, the province has invested $2.2 million of the total $4-billion commitment.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The completion of five significant upgrades to highways and infrastructure in the Swan River and Dauphin areas at a cost of more than $20 million will increase safety and improve traffic flows for motorists, truckers and farmers, Infrastructure and Transportation Minister Steve Ashton announced today. &#8220;This investment in highways and roads, and the installation of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[13],"class_list":["post-18778","post","type-post","status-publish","format-standard","hentry","category-local","tag-coverage"],"_links":{"self":[{"href":"https:\/\/swanriver.valleybiz.ca\/news\/wp-json\/wp\/v2\/posts\/18778","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/swanriver.valleybiz.ca\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/swanriver.valleybiz.ca\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/swanriver.valleybiz.ca\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/swanriver.valleybiz.ca\/news\/wp-json\/wp\/v2\/comments?post=18778"}],"version-history":[{"count":0,"href":"https:\/\/swanriver.valleybiz.ca\/news\/wp-json\/wp\/v2\/posts\/18778\/revisions"}],"wp:attachment":[{"href":"https:\/\/swanriver.valleybiz.ca\/news\/wp-json\/wp\/v2\/media?parent=18778"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/swanriver.valleybiz.ca\/news\/wp-json\/wp\/v2\/categories?post=18778"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/swanriver.valleybiz.ca\/news\/wp-json\/wp\/v2\/tags?post=18778"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}